Diamond Cable with Bobble Knitting Stitch.
Abbreviations
k = knit
p = purl
T5R = (twist 5 right), slip next 2 sts onto cable needle and hold at the back of work, knit next 3 stitches on left-hand needle, then purl sts from cable needle.
T3B = (twist 3 back), slip next st onto cable needle and hold at back of work. knit next 2 sts from left- hand needle, then purl st from cable needle.
T3F (Twist 3 Front) = slip next 2 sts onto cable needle and hold at front of work, purl next st from left-hand needle, then knit sts from cable needle.
MB (make bobble) = (Kl, pl) twice all into next st. pass 2nd, then 3rd and 4th its over first st and off needle (babble completed),
Cast on
Panel of 9 sts on a background of reverse St st.
Cable and Bobble Written Pattern
- Ist row (right side): P2, T5R, p2.
- 2nd row: K2, p2, kl, p2, k2
- 3rd row: PI, T3B, pl, T3F, pl.
- 4th row: K1, p2, k3, p2, kl.
- 5th row: T3B, p3, T3F.
- 6th row: P2, k5, p2.
- 7th row: K2, p2, MB, p2, k2
- 8th row: As 6th row.
- 9th row: T3F, p3, T3B.
- 10th row: As 4th row
- 11th row: PI,T3F, pl, T3B, pl.
- 12th row: As 2nd row.
Rep these 12 rows.
See More
Cable Knitting Patterns (all with written instructions)