Diamond Cable with Bobble Knitting Stitch. Abbreviations k = knit p = purl T5R = (twist 5 right), slip next 2 sts onto cable needle and hold at the back
Diamond Cable with Bobble Knitting Stitch. Abbreviations k = knit p = purl T5R = (twist 5 right), slip next 2 sts onto cable needle and hold at the back
Lifted increase Lifted increase is made by working into the stitch below as well as into the stitch itself. The result is almost invisible, but there is a definite slant
Raised Increases Raised increase is made by picking up a horizontal strand between two stitches and working it as if it were a stitch. There are two ways for this
How to create YO (yarn over) Increases. An increase (inc) is the addition of a stitch. Its main function is for shaping, but it is also used in combination with